Otávio Augusto Ladoruski

  • Total activity 18
  • Last activity
  • Member since
  • Following 0 users
  • Followed by 0 users
  • Votes 1
  • Subscriptions 4

Articles

Recent activity by Otávio Augusto Ladoruski Recent activity Votes
  • User Operation Manual

    The Integra System Operation Manual provides a structured guide to system navigation, indicator meanings, and key functionalities. It covers environment monitoring, feed and water management, egg f...

  • Counting sensor is not reading

    Counter sensors (such as water meters, egg counters, and dump scales) may stop registering values if an unexpected or invalid value is received. When this happens, the system automatically stops re...

  • System password

    The access to areas of the program that allows parameters changing are password protected. The standard password is LOCKTo change the password, select Edit password on the Configure section. Enter ...

  • VNC Password

    To access a computer through the UltraVNC Viewer program, type in the computer IP address. The standard password is: ntadmThe IP adress to a IntraE computer will be always: 192.168.0.24

  • DGP Interfacing

    Description/CompositionThe DGP board (Data Gathering Panel) serves as the interface between house-level sensors/actuators and the Integra system, which runs on IntraE PCs located in the barns or on...

  • How to start/end a flock?

    To initialize a new flock, click on Zone configuration, click on  Setup 0-999 day schedule button on Zone setup. Then click Initialize schedule. Enter the date and time for starting a new flock. Th...

  • Lights operation

    Each zone can support up to 16 distinct lighting environments per group (e.g., aisle, top tier, bottom tier, etc.).The system manages each lighting environment using two separate outputs: Light and...

  • Time or date incorrect on Integra System

    The Integra System does not allow you to set the time or date manually. It always uses the time and date from the Windows system. Use a mouse or keyboard to access the computer. Go to Settings > T...

  • Communication architecture

    In the Integra Classic architecture, control is centralized at the main computer (V20), located in the office and connected to standard I/O devices (e.g., screen, keyboard). Each house has an Intra...

  • Communication architecture

    In the Integra NV architecture, control is distributed across individual houses, each equipped with its own Control Station for environmental control. The Viewer Control Station allows parameter se...