Otávio Augusto Ladoruski
- Total activity 18
- Last activity
- Member since
- Following 0 users
- Followed by 0 users
- Votes 1
- Subscriptions 4
Activity overview
Latest activity by Otávio Augusto Ladoruski-
Otávio Augusto Ladoruski created an article,
Integra Solutions Onboarding
This video briefly introduces the three main Integra architectures, highlighting the differences between them.AEI Solutions Onboarding.mp4
-
Otávio Augusto Ladoruski created an article,
Parts Order Web Page
Link: Parts Order Web Page
-
Otávio Augusto Ladoruski created an article,
Communication loss
When there are communication problems in Integra, the top section on the screen header will flash what DGP is failing.Entering DGP Diagnosis screen to check the DGP is the best method to see what i...
-
Otávio Augusto Ladoruski created an article,
User Operation Manual
The Integra System Operation Manual provides a structured guide to system navigation, indicator meanings, and key functionalities. It covers environment monitoring, feed and water management, egg f...
-
Otávio Augusto Ladoruski created an article,
Counting sensor is not reading
Counter sensors (such as water meters, egg counters, and dump scales) may stop registering values if an unexpected or invalid value is received. When this happens, the system automatically stops re...
-
Otávio Augusto Ladoruski created an article,
System password
The access to areas of the program that allows parameters changing are password protected. The standard password is LOCKTo change the password, select Edit password on the Configure section. Enter ...
-
Otávio Augusto Ladoruski created an article,
VNC Password
To access a computer through the UltraVNC Viewer program, type in the computer IP address. The standard password is: ntadmThe IP adress to a IntraE computer will be always: 192.168.0.24
-
Otávio Augusto Ladoruski created an article,
DGP Interfacing
Description/CompositionThe DGP board (Data Gathering Panel) serves as the interface between house-level sensors/actuators and the Integra system, which runs on IntraE PCs located in the barns or on...
-
Otávio Augusto Ladoruski created an article,
How to start/end a flock?
To initialize a new flock, click on Zone configuration, click on Setup 0-999 day schedule button on Zone setup. Then click Initialize schedule. Enter the date and time for starting a new flock. Th...
-
Otávio Augusto Ladoruski created an article,
Lights operation
Each zone can support up to 16 distinct lighting environments per group (e.g., aisle, top tier, bottom tier, etc.).The system manages each lighting environment using two separate outputs: Light and...